Terra-Petra Environmental Engineering Recognized in the LA Times as part of Wilshire Grand project - tallest skyscraper in the West.

Terra-Petra Team recognized in the LA Times as part of the Wilshire Grand project – the tallest structure in the west and the Los Angeles skyline.

The Wilshire Grand project grew from a handshake to become the tallest building west of the Mississippi. For three years, Times staff writer Thomas Curwen has chronicled its construction, from the initial planning phase to the topping off and final design touches. One the pages, are his stories of the Wilshire Grand tower.

To express his appreciation to all those who were involved with the Wilshire Grand project, Korean Air & Hanjin Group (property owner) Chairman Yang Ho Cho, placed the multiple-page advertisement in the Los Angeles Times  on June 27, 2017. He wanted to  publish the name of every person who worked on the project.

Working closely with A.C. Martin and Turner Construction on Los Angeles’ newest and tallest skyscraper, the Terra-Petra team is proud to be recognized in this LA Times piece (attached/linked PDF) above. 

The Trojan Marching Band headlined the special Ribbon Cutting Ceremony on the Plaza area to celebrate the Grand Opening of the Wilshire Grand Center (June 23rd). The media covered event was hosted by Korean Air & Hanjin Group. Chairman (and USC alum) Cho and his team also hosted a private party in the building that evening.

Below are a few highlights we grabbed during the grand opening ceremony—along with fresh photos of, what Chairman Cho describes as, “the crown jewel of Figueroa Street.” Again, Terra-Petra is proud to be recognized as part of this outstanding project.

USC Trojan Marching Band headlines Wilshire Grand Center Grand Opening June 23 2017

TERRA-PETRA ELD

The Use of Electronic Leak Detection (ELD) on Waterproofing Membranes over Concrete Surfaces

Waterproofing membranes are a key element in building enclosure systems—a key element that ultimately gets covered up by a variety of finish materials including landscaping, green roofs, topping slabs, pavers and so on. As most of us know, excavation to expose a failed waterproofing membrane for repairs can be prohibitively expensive and in some cases impossible. For this reason, many designers are choosing to specify integrity testing to verify that the waterproofing membrane is free of discontinuities and penetrations through the membrane prior to the installation being permanently covered. When integrity testing is not specified, many contractors are often performing this type of testing voluntarily to avoid future problems or “call-backs.”

The most common integrity testing method is the flood test. Flood testing is typically performed by flooding waterproofed horizontal surfaces with at least two inches (50 mm) of water for a period of up to 48 hours. Temporary dams are often constructed to partition the test areas, provide an up-turned plaza edge and control the depth of the flood testing. During the flood test, access to the underside of the flooded areas is necessary for a visual inspection of water leakage. However, in the case of a membrane failure (leak), flood testing indicates only where water is penetrating through the entire assembly within the test area, not the location above where water is breaching the membrane. In addition, flood testing cannot be performed on vertical surfaces or at locations where the underside of the slab is not accessible.

The aforementioned restrictions and lack of conclusive data associated with flood testing has enabled Electronic Leak Detection (ELD) to gain momentum as a viable alternative to traditional flood testing. This article will focus on the different types of ELD and the applications where ELD is or is not well-suited.

READ FULL ARTICLE HERE

Terra-Petra ELD information

California Commercial Real Estate Unchanged Following Election – Read Survey

The introduction to this survey is provided by John M. Tipton Partner, Real Estate Department Allen Matkins:

Allen Matkins and UCLA Anderson Forecast have partnered to create a Commercial Real Estate Survey and Index to better predict future California commercial rental and vacancy rates. This tool surveys supply-side participants – commercial developers and financiers of commercial development – for insights into their markets. The Survey and the resulting Index provide a measure of the commercial real estate supply-side participants’ view of current and future conditions. Since participants make investment actions based upon these views, it provides a leading indicator of changing supply conditions.

Allen Matkins sponsored this Survey to provide value to the industry. Partnered with UCLA Anderson Forecast, the leading independent economic forecast of both the U.S. and California economies for over 65 years, they have tapped the knowledge of the leading developers and financiers of real estate development in California to provide the best, clear-sighted forecast of the California commercial real estate industry.

Read they Survey and Index here.

Watch the video below (click to open to a new window):

LA Unified School District Awards Terra-Petra Certification of Small Business Enterprise (SBE)

LA Unified School District Awards Terra-Petra Certification of Small Business Enterprise (SBE)

The Los Angeles Unified School District (LAUSD) issued Terra-Petra an SBE certificate effective October 26, 2016.

The company’s SBE status lausdcertificationofsbeis recognized for NAICS codes:

541620 & 541330 through October 2018.

To maintain a valid SBE Certificate after three years with LAUSD, Terra-Petra must also renew its self-certification with LAUSD or register with the Small Business Administration before the SBE certification expiration date referenced expires.

Letter of approval.

Mixed-use project, called Metropolis, is unprecedented for Downtown L.A.

If you travel down through the Downtown LA area on a regular basis, you have probably noticed the every-changing skyline. As an environmental engineering firm, Terra-Petra is taking part with many of these new projects. One of which is called the Metropolis (you can't miss this large mixed-use community steadily growing along the 110 freeway). The Terra-Petra Waterproofing Division is consulting on the building envelope waterproofing system for the Metropolis project and inspecting all of the waterproofing as it gets installed. 

Read more about Metropolis and other projects currently being led by Chinese developers in Downtown Los Angeles.

Screenshot 2016-08-31 at 10.19.27 PM

Terra-Petra’s Abode Communities and Mercy Housing Project to Break Ground in Wilmington, CA

Terra-Petra has been honored to be a part of this incredible development in Wilmington, California. Abode Communities and Mercy Housing will celebrate their Vista del Mar and Camino del Mar Groundbreaking on September 14, 2016.

Terra-Petra Adobe Communities project, Wilmington CA 2016

Terra-Petra designs subterranean waterproofing on DTLA Oceanwide Plaza

Working closely with Oceanwide Plaza, LLC Vice President Peter Lai (featured in the video below), Terra-Petra designed the subterranean waterproofing  (which Terra-Petra is also still currently inspecting).on the walls of Oceanwide Plaza project site – easily seen via the aerial camera shots in the video. Lendlease, an international property and infrastructure company, recently announced the completion of the initial mat foundation pour for the Oceanwide Plaza development in Downtown Los Angeles to allow for vertical construction of the project to begin. Read the article here

Read the full article here.

1 2 3 4