DEC 21 – Progress Photo Update Methane Mitigation Design & Inspection DTLA

Methane Mitigation Design & Inspection

Here are the latest updated progress photos from December on this development in Los Angeles.  It’s been an exciting year in 2021 to be involved on this project.  Terra-Petra provided methane mitigation design and methane inspection services for this project.

We’re very proud to be a part of this project and to see the progress as it moves forward towards completion.  Click any photo below to enlarge.

If your development project, building or home is in need of Terra-Petra’s methane services, whether it’s methane mitigation design, methane soil gas investigation, methane inspection, methane testing, methane monitoring or methane consulting then Terra-Petra is your top resource.

Contact us today to learn more.

Construction Progress Photos

Terra-Petra contributes to new projects transforming Downtown LA

As one of the most well-known environmental engineering and building waterproofing companies in the Los Angeles basin, Terra-Petra is currently working on or has completed some very high-profile projects in the Downtown LA area. Some of the most notable projects, among many others, include:

The Wilshire Grand Tower – the Wilshire Grand skyscraper will one day be the tallest west of Chicago. (Terra-Petra photo of project start to the right.)

The Metropolis, a $1B development is one of the largest mixed-use projects under construction on the West Coast.

Oceanwide Plaza will break ground in spring 2015. This $1B project will have a total of three towers and an expansive above-ground outdoor space. A five star hotel and 200k SF of commercial space will be included. There will be 504 condos and 183 hotel rooms.

South Park Mega-Project (Chinese developer Shenzhen Hazens) is a three towers along Figueroa Street across from L.A. Live. A 30-story hotel tower would rise at the northwest corner of Flower and Eleventh streets. A 30-story condo tower would be at Figueroa and Eleventh streets, and a 42-story condo tower would be at Figueroa and Olympic.

According to the Los Angeles Department of Building and Safety (LADBS), the "flurry of activity" in the recent years is defiantly the biggest construction boom they have witnessed since the 1980s.

However, LADBS does say that it is yet to be seen if it's the biggest boom in history or not. 

Stay tuned.

4 DEVELOPMENTS THAT WILL TRANSFORM FIGUEROA
Los Angeles Mixed-Use Jan 14, 2016 Jerry Liu, Bisnow, LA

We already told you about some of the mega-projects that will reshape Sunset Boulevard, perhaps one of the most famous thoroughfares in the world. But if you're really following what's hot in LA, it's all about Downtown. So we decided to take a look at some of the developments that will reshape the future of one of Downtown's most notable streets:

1. Circa
Location: 1200 Figueroa Players: Hankey Investment, Jamison Services, Falcon California Investments, Highlands Capital, Harley Ellis Devereaux, LendLease. Completion date: Late 2017. The $500M project will build twin 35-story towers housing 648 luxury condos on top of a seven-story retail podium. There will also be 48k SF of retail and 1,770 parking spaces. This project broke ground in summer 2015 and features a curved glass look that offers a panoramic view of LA, and many other neighboring high-rises, including the Metropolis. Bisnow chatted with Hankey president Scott Dobbins this week to get the latest status update on the development.

2. Oceanwide Plaza
Location: Figueroa and 11th Players: Oceanwide Real Estate Group. Completion date: 2018, condos hit the market in 2017. Breaking ground in spring 2015, this $1B project will have a total of three towers and an expansive above-ground outdoor space. A five star hotel and 200k SF of commercial space will be included. There will be 504 condos and 183 hotel rooms total. Chinese firm Oceanwide had previously acquired the development from New York City-based Moinian Group. This will be the first real estate venture for Oceanwide outside China.

3. Shenzhen Hazens
Location: Entire block bounded by Figueroa, 11th Street, Flower Street and Olympic Boulevard Players: Shenzhen Hazens, Gensler Completion date: After 2020. It's no secret Chinese firms are transforming the LA landscape. Shenzhen Hazens will add to the mix with a $700M redevelopment in the Luxe Hotel area. The project plans to break ground in 2017 and will be split into two phases. Phase 1 would build two 30-story towers, one residential and one hotel. Phase 2 would completely replace the Luxe Hotel with a 42-story residential tower. Expect the finished mega-project to have 650 luxury condos, 250 hotel rooms and 80k SF of retail space. We caught up with Shenzhen Hazens Group executive project director Sonnet Hui recently to get more on the company's plans.

4. MyFigueroa
Location: Four miles of streets from Downtown LA to South LA. Players: LADOT, Troller Mayer Associates, Melendrez, GEHL Architects. Completion date: 2017. Promising to make it easier for transit and bicycle users, this project will start in late spring 2016 and complete in 2017 under a $20M budget. It will link USC and Exposition Park to Downtown LA with better signals, signage, crosswalks, transit platforms, bikeways and trees. There will be on-street, fully separated bike lanes on each side of Figueroa for 27 signalized intersections. There will also be a lot more accommodations for public transit, including for the Silver Line and the upcoming streetcar service.

Family House Mission Bay, San Francisco breaks ground September 17th

We are very excited to be a part of this fantastic project. Terra-Petra will handle the methane mitigation as well as below grade waterproofing design and inspection.

Click on the image to download the entire San Francisco Business Times supplement. 

san-francisco-business-times-supplement-september-2014_Page_1

Terra-Petra named methane design engineer and subterranean waterproofing consultant for Korean Air Wilshire Grand project

Wilshire Grand Hotel Los Angeles - AC MARTINTerra-Petra is proud to announce its role as the methane mitigation design engineer and subterranean waterproofing consultant for what will be the tallest building west of the Mississippi, the Korean Air Wilshire Grand project. Once completed, this 73 story skyscraper will top out at 1,100 feet tall and offer 5 levels of subterranean parking below grade. Earlier this year, Terra-Petra contracted with the prestigious architectural design firm of AC Martin Partners to prepare the methane mitigation and waterproofing system construction documents.

Terra-Petra had a very tight window in which to complete our design work, given the discovery of the methane mitigation design requirement only weeks before the foundation only permits were to be pulled. Fortunately, due to the strong capabilities of the Terra-Petra design team, we were able to deliver the necessary drawings on time in order to ennsure the project remained on schedule with no delays.

On November 21, 2013, Terra-Petra attended a pre-construction meeting, with Turner Construction, to discuss the installation of the methane mitigation/waterproofing system for the project (which is scheduled to start in December). Terra-Petra will also be performing the Deputy Methane Barrier Inspection (DMBI) work for the duration of this project.

“It's not every day that you get to say you had a hand in designing the tallest building west of the Mississippi. I am very appreciative of the opportunity that AC Martin has given Terra-Petra to be a part of this prestigious project. You never want to start behind the 8 ball and have to design to an extremely expedited schedule as we had on this project, but we did it! I feel that the work Terra-Petra has carried out is a testament to who we are as a company; knowledgeable, responsive, dedicated and really good at what we do. Needless to say I am very proud of my team," said Justin Conaway, Terra-Petra's Vice President and General Manager. 

According to the Wilshre Grand Center's website: “Starting in 2012, the property at the site of the former Wilshire Grand Hotel will be cleared to make way for a visionary new hotel and mixed-use building. Under the leadership of Korean Air, the developer of the project, the new building will revitalize the property and allow the site to continue being the indelible landmark it has always been. Doors will open to L.A. and the world in 2017, building upon the Wilshire Grand’s rich history." 

Additional highlights: 

  • This innovative project will be a completely new and unique experience in Los Angeles’ downtown. When the doors open in 2017, the project will be one of the most advanced, sophisticated, sustainable and unique buildings in Southern California.
  • With a unique “sky lobby” offering unparalleled views of the city and a breathtaking infinity pool, the building will rise 73 stories in the air as Los Angeles’ second tallest building.
  • 900 state-of-the-art hotel rooms, which will be operated by a flagship luxury hotel brand, will set a new standard for hospitality in Los Angeles.
  • 400,000 square feet of Class ‘A’ office space will attract high-end business leaders and make the building a global engine for business.
  • 45,100 square feet of new restaurant and retail space housing world-class restaurants will make this an epicurean delight and drive downtown’s food and cultural renaissance.
  • Pedestrian friendly access to downtown, as well as local and regional transit connections, will make the project a central and easily accessed location for visitors and Angelenos.
  • Innovative outdoor space and exterior plazas will invite guests and visitors to experience the true Los Angeles lifestyle and climate

For more information go to: www.wilshiregrandcenter.com

Related articles and websites:

http://www.wilshiregrandcenter.com/
http://www.latimes.com/business/la-fi-property-report-20130808,0,976227.story#axzz2lJN2SaRf

Terra-Petera Methane begins mitigation system installation project for The Irvine Company in Playa Vista, California

Terra-Petra is excited to announce that the methane mitigation system installation is in progress on three new apartment complexes in Playa Vista being developed by The Irvine Company.

The Irvine Company selected the architectural firm of McLarand Vasquez Emsiek & Partners (MVE) out of Irvine to realize their vision of bringing a premier apartment community to the west side of Los Angeles. MVE has designed three mediterranean style apartment complexes each having one level of subterranean parking with on grade parking and four levels of apartments above grade. The building footprints increase in size moving from west to east from 187,067 SQ.FT., 256,866 SQ.FT. and 333,827 SQ.FT. 

MVE’s design team for these three projects included the following prestigious firms:

Structural Engineer: Englekirk –  Los Angeles
Civil Engineer: Fuscoe – Irvine
Geotechnical Engineer: Group Delta – Torrance

The project are located in the City of Los Angeles Methane Zone, thus Terra-Petra was selected by The Irvine Company as the methane design engineer for these projects given our strong Terra-Petra personnel witnessing the installation of Treco Barrier Solutions Vapor Lock-M. Left to right Andrew Alvarran, Jesus Mora, Danile Valdez and Eduardo Rangelreputation as a high quality methane consulting firm as well as our ability to simultaneously design three large scale complex projects in an expedited fashion. We were brought on to the design team in February of this year. We completed the methane mitigation system design work along with all permitted systems by the beginning of October, and way ahead of schedule.

The construction phase of this development began under Western National, serving as the General Contractor on the project. All three buildings are being constructed concurrently and Terra-Petra will be responsible for carrying-out all Deputy Methane Barrier (DMBI) inspection work for each one. The arduous task associated with performing continuous inspections of the methane mitigation system for three projects being constructed simultaneously can only be achieved by Terra-Petra given that we maintain the largest and most experienced staff of DMBI Inspectors in the industry.  

We're looking forward to completing another successful methane mitigation project!

Related articles on the Playa Vista Development.   

http://www.ocbj.com/news/2012/oct/28/irvine-company-eyes-playa-vista/
http://online.wsj.com/news/articles/SB10001424127887324784404578145572308360156
http://articles.latimes.com/2012/nov/26/business/la-fi-mo-playa-vista-sale-20121121

Grand Opening Of The New Terra-Petra San Francisco Office

Terra-Petra would like to officially announce the grand opening of its new office in San Francisco. We acknowledge the growing and highly consistent need for methane and vapor intrusion mitigation services in the Bay Area, and we are very excited to now have regular local representation to better serve our clients in a continued effort to offer superior and highly responsive services. 

The Terra-Petra San Francisco office is located at:

One Sansome Street, Suite 3500
San Francisco, CA 94104

Phone: 415.590.4890
Fax: 415.590.4891

 

Contact us for more details about our new San Francisco location, or schedule an appointment today.

 

Terra-Petra Completes Methane Barrier and Below Grade Waterproofing Work on Cedars-Sinai’s Completed Advanced Health Sciences Pavilion Project

The new Cedars-Sinai Advanced Health Science Pavilion integrates clinical care and biomedical research in a single building. Terra-Petra Environmental Engineering developed the combination LADBS approved methane mitigation system as well as the buildings below grade waterproofing system for the 820,000 square foot structure.

According to Terra-Petra's VP/General Manager, Justin Conaway, "Terra-Petra performed all LADBS Deputy Methane Barrier Inspections (DMBI) for this project; we also provided manufacturer required below grade waterproofing system inspections to ensure the project received the full 15 year Hydro Shield warranty."

Terra-Petra Deputy Methane Barrier Inspectors are cross-trained, qualified and certified to perform the below grade waterproofing inspections in order to provide a substantial cost-savings by performing both of services with one inspector. Terra-Petra currently employs 7 LADBS Deputy Methane Barrier Inspectors (DMBI).

"We are proud to be a part of such an outstanding project and very excited for Cedars-Sinai Medical Center and their quest to provide services for today's new era of health care within the new Advanced Health Sciences Pavillion," said Kevin Buchanan, President of Terra-Petra.

Raul Ramierz joins Terra-Petra’s Deputy Methane Barrier Inspection (DMBI) Team

Terra-Petra congratulates Raul Ramirez who is now officially certified by the City of Los Angeles as a Deputy Methane Barrier Inspector (DMBI). 

Raul successfully passed both the written and oral examinations carried out by the Los Angeles Department of Building and Safety Materials Control Section this past Monday August 5, 2013.

Terra-Petra maintains the largest staff of Deputy Methane Barrier Inspectors in the industry. The addition of Mr. Ramirez to the Terra-Petra team will provide additional flexibility to respond to inspection demands without delaying the construction progress.

Environmental Engineering Firm, Terra-Petra, Continues to Expand LA City Deputy Methane Inspector Team

soilgas1

 

 

 

 

 

 

 

 

Most governing agencies require methane gas barrier inspections. Terra-Petra, an environmental engineering firm based in Los Angeles, has announced that it will continue to expand its current Deputy Methane (Barrier) Inspection team as methane barrier inspection services become more and more in demand and necessary in the City of Los Angeles. All methane gas mitigation systems should be inspected by a certified professional with experience in methane gas mitigation systems to insure that they have been installed properly.Terra-Petra's expanding Deputy Methane Barrier Inspection team will continue to provide this much needed service throughout the City of Los Angeles.

> > >Read more.