Terra-Petra performs CQA/CQC for the Porsche Experience Center Test Track in Carson, CA

The panoramic photo belows illustrates the primary landfill liner being installed below the Showroom Building for the future Porsche Entertainment Center Test Track in Carson California. Terra-Petra was hired to perform the Construction Quality Control/Construction Quality Assurance (CQA/CQC) inspections based on our expertise in the field.

Porsche Experience Center Test Track, Showroom Building Carson, CA

Terra-Petra Methane Engineer for Micropolitan at Urban Lights Project

Micropolitan-dayThe first shovel has hit the dirt on The Micropolitan at Urban Lights, a luxury apartment building being developed by Micropolitan in Los Angeles. The property continues our commitment to create a multi-family living experience that caters to today’s walkable urban lifestyle.

Terra-Petra served as the project's Methane Engineer.

Located in the heart of the thriving Mid-Wilshire area, the 45-unit building is across from the Los Angeles County Museum of Art and just 350 feet from the future Metro Purple Line station. The four-story building offers one- and two-bedroom units, with parking at ground level and three stories of living space above.

Some of the features of the amenity-filled complex include garden courtyard areas for outdoor living, dining, and relaxation; a business center; entertainment room; pet care center; and bike repair shop, among others. For more information, contact Micropolitan President Larry Kuger.

Daniel Valdez holds successful DMBI training seminar in Terra-Petra’s Los Angeles Office

Terra-Petra's Director of Field Operations Daniel Valdez Inspector training seminarTerra-Petra's Director of Field Operations, Daniel Valdez, held a Deputy Methane Barrier Inspector training seminar in our Los Angeles office this past week. He is responsible for overseeing the largest Deputy Methane Barrier Inspection (DMBI) team in the industry–as the Terra-Petra DMBI team continues to grow.  Daniel believes that it is imperative to periodically go over inspector responsibilities, requirements and reporting protocols to ensure that the information stays fresh in every inspector's mind and that Terra-Petra maintains continuity across the company.

IMG_20140430_163553_993Valdez is also a big proponent of staying in touch with the material manufacturers to ensure that his team members are certified to perform their work, keep up to speed with changing technologies, warranty requirements, what approved applicators are out there and inspection and reporting procedures. 

To that end he was able to schedule an inspector's certification webinar on the CETCO Hydroshield Warranty system to follow his presentation. The webinar was a refresher for most of the inspectors on the Terra-Petra DMBI team, who have inspected several projects under the Hydroshield program. Five new inspectors are set to receive certification for the first time.

The seminar was a success and there is no one more qualified than Mr. Daniel Valdez to have given the presentation.

Terra-Petera Methane begins mitigation system installation project for The Irvine Company in Playa Vista, California

Terra-Petra is excited to announce that the methane mitigation system installation is in progress on three new apartment complexes in Playa Vista being developed by The Irvine Company.

The Irvine Company selected the architectural firm of McLarand Vasquez Emsiek & Partners (MVE) out of Irvine to realize their vision of bringing a premier apartment community to the west side of Los Angeles. MVE has designed three mediterranean style apartment complexes each having one level of subterranean parking with on grade parking and four levels of apartments above grade. The building footprints increase in size moving from west to east from 187,067 SQ.FT., 256,866 SQ.FT. and 333,827 SQ.FT. 

MVE’s design team for these three projects included the following prestigious firms:

Structural Engineer: Englekirk –  Los Angeles
Civil Engineer: Fuscoe – Irvine
Geotechnical Engineer: Group Delta – Torrance

The project are located in the City of Los Angeles Methane Zone, thus Terra-Petra was selected by The Irvine Company as the methane design engineer for these projects given our strong Terra-Petra personnel witnessing the installation of Treco Barrier Solutions Vapor Lock-M. Left to right Andrew Alvarran, Jesus Mora, Danile Valdez and Eduardo Rangelreputation as a high quality methane consulting firm as well as our ability to simultaneously design three large scale complex projects in an expedited fashion. We were brought on to the design team in February of this year. We completed the methane mitigation system design work along with all permitted systems by the beginning of October, and way ahead of schedule.

The construction phase of this development began under Western National, serving as the General Contractor on the project. All three buildings are being constructed concurrently and Terra-Petra will be responsible for carrying-out all Deputy Methane Barrier (DMBI) inspection work for each one. The arduous task associated with performing continuous inspections of the methane mitigation system for three projects being constructed simultaneously can only be achieved by Terra-Petra given that we maintain the largest and most experienced staff of DMBI Inspectors in the industry.  

We're looking forward to completing another successful methane mitigation project!

Related articles on the Playa Vista Development.   

http://www.ocbj.com/news/2012/oct/28/irvine-company-eyes-playa-vista/
http://online.wsj.com/news/articles/SB10001424127887324784404578145572308360156
http://articles.latimes.com/2012/nov/26/business/la-fi-mo-playa-vista-sale-20121121

Building Waterproofing Experts Project Update: Waterproofing System Design and Inspections in West Hollywood

BWE - West Hollywood ProjectTerra-Petra and Building Waterproofing Experts (BWE) provide the installation of a below grade waterproofing system designed for a proposed new hardware store at the corner of Melrose and Westmount in West Hollywood, California. Details and more photos on:  Building Waterproofing Experts News Blog.

Terra-Petra Completes Methane Barrier and Below Grade Waterproofing Work on Cedars-Sinai’s Completed Advanced Health Sciences Pavilion Project

The new Cedars-Sinai Advanced Health Science Pavilion integrates clinical care and biomedical research in a single building. Terra-Petra Environmental Engineering developed the combination LADBS approved methane mitigation system as well as the buildings below grade waterproofing system for the 820,000 square foot structure.

According to Terra-Petra's VP/General Manager, Justin Conaway, "Terra-Petra performed all LADBS Deputy Methane Barrier Inspections (DMBI) for this project; we also provided manufacturer required below grade waterproofing system inspections to ensure the project received the full 15 year Hydro Shield warranty."

Terra-Petra Deputy Methane Barrier Inspectors are cross-trained, qualified and certified to perform the below grade waterproofing inspections in order to provide a substantial cost-savings by performing both of services with one inspector. Terra-Petra currently employs 7 LADBS Deputy Methane Barrier Inspectors (DMBI).

"We are proud to be a part of such an outstanding project and very excited for Cedars-Sinai Medical Center and their quest to provide services for today's new era of health care within the new Advanced Health Sciences Pavillion," said Kevin Buchanan, President of Terra-Petra.

Environmental Engineering Firm, Terra-Petra, Continues to Expand LA City Deputy Methane Inspector Team

soilgas1

 

 

 

 

 

 

 

 

Most governing agencies require methane gas barrier inspections. Terra-Petra, an environmental engineering firm based in Los Angeles, has announced that it will continue to expand its current Deputy Methane (Barrier) Inspection team as methane barrier inspection services become more and more in demand and necessary in the City of Los Angeles. All methane gas mitigation systems should be inspected by a certified professional with experience in methane gas mitigation systems to insure that they have been installed properly.Terra-Petra's expanding Deputy Methane Barrier Inspection team will continue to provide this much needed service throughout the City of Los Angeles.

> > >Read more.

 

1 2 3 4