Methane Mitigation Design – Hub on Campus LA Figueroa

Terra-Petra is currently working with AMP Development to provide methane mitigation design and consulting services for the proposed new Hub on Campus LA Figueroa, located in Los Angeles, CA.

The project will consist of the construction of a new 7-story commercial residential mixed-use development with 5,128 SF of commercial space and 157 residential dwelling units with a single level subterranean basement. The total building footprint is approximately 41,600 SF.

The scope of work includes methane mitigation design and permitting, and construction administration support (material submittal review, field sketches, Request for Information [RFI’s], and attending any specialized construction coordination conferences).

Methane Soil Gas Investigation – Enlightenment Plaza

Terra-Petra completed a methane soil gas investigation on behalf of Killefer Flammang Architects at Enlightenment Plaza, in Los Angeles, CA. The new multi-phase development will include the construction of 5 new slab on grade apartment buildings.

The overall site is approximately 90,984.2 SF. LADBS required a site investigation as the property falls in a Methane Buffer Zone. Terra-Petra completed the LADBS required MSGI under Terra-Petra’s LADBS Methane Testing Lab License #10224.

Methane Mitigation Design – Torat Hiyam

Level II Methane Mitigation Design

Terra-Petra has just closed  with Torat Hiyam to provide methane mitigation design for their new project in Los Angeles, CA.

The new construction will consist of a 5 story school building, with a basketball court and a library.

The scope of work will include a Level II methane mitigation design plan with permitting to be approved by LADBS Mechanical Department Plan Check.

Methane Soil Gas Investigation In Los Angeles

Terra-Petra has submitted a bid to Data Specialties to conduct a methane soil gas investigation on a LADBS Methane Buffer Zone Property on in Los Angeles, CA.  The proposed project will consist of an electrical upgrade, with no new building construction.

The scope of work includes shallow and deep boring at the site, and monitoring methane gas concentrations and pressure on consecutive days in order to prepare an LADBS Certificate of Compliance for Methane Test Data.

1041 s oxford drive

Methane Soil Gas Investigation – Methane Buffer Zone

Methane Soil Gas Investigation (SGI)

Grace Partnership, Inc has on-boarded Terra-Petra to conduct a City of Los Angeles Methane Soil Gas Investigation (SGI) in Los Angeles. The property falls within a Methane Buffer Zone.

Terra-Petra recently completed the site assessment and sampling in accordance with LADBS guidelines under Terra-Petra’s LADBS Methane Testing Lab License #10224.

We are in the process of drafting the Summary of Methane Soil Gas Investigation report and will be delivering it to the client shortly.

purple line extension project

Methane Monitoring – LA Metro Purple Line Extension Project

Methane Monitoring Reports For Metro Purple Line Expansion Project

Terra-Petra is pleased to announce that our Environmental Engineering Specialist has signed off on monthly methane monitoring reports required for the Metro Purple Line Extension project in Beverly Hills.

The soil gas monitoring will be done at two zones: the Beverly Hills High School (BHHS) area, and near the Fine Arts Theater on Wilshire Blvd.

City of Los Angeles Methane Mitigation and Gas Detection System Design

Methane Mitigation Design

Methane Mitigation And Gas Detection System Design, City of Los Angeles

Terra-Petra wrapped up a City of Los Angeles Methane Mitigation and Gas Detection System Design for a Level 5 methane site for Welcome Projects of Los Angeles, CA. Terra-Petra provided design consultation for the new ground up single-family Accessory Dwelling Unit (ADU) as well as the addition to the existing home.

1 2