Case Study: Methane Consulting - Cedar Sinai Medical Center Los Angeles, CA

Methane Zone Level I | 3 Levels Below Grade | 67,032 SF Footprint

THE CHALLENGE

A hospital expansion with extreme subsurface

conditions:

  • Parking structure extending ~20 feet into the underground La Cienega River
  • Significant water intrusion risk
  • Methane code requirements mandating:
    • Permanent dewatering + filtration system
    • Full methane mitigation membrane + venting system

Translation:  High complexity + very high cost

SOLUTION

Terra-Petra didn’t just design the required system —they challenged the assumptions driving cost.

Key actions:

  • Negotiated directly with LADBS to eliminate the requirement for a permanent dewatering system
  • Redesigned the methane mitigation approach to meet code with a more efficient system
  • Specified a dual-purpose membrane that functioned as both:
    • Waterproofing system
    • Methane soil gas barrier (agency-approved)
  • Secured a 15-year, no-questions-asked waterproofing warranty

OUTCOME

  • Eliminated a major capital and long-term maintenance cost (permanent dewatering system)
  • Achieved full regulatory approval with a more efficient methane system
  • Reduced system redundancy by combining waterproofing + vapor barrier
  • Delivered long-term protection backed by a 15-year warranty

THE TAKEAWAY

Terra-Petra’s experience and deep understanding of the requirements and available materials allowed them to navigate, challenge, and optimize within the code – without compromising safety.

That’s real expertise showing up.

Give Us A Call

Got a project that requires methane consulting and/or a vapor intrusion mitigation system?