Terra-Petra congratulates newest DMBI inspectors

Terra-Petra congratulated its newest DMBI inspectors, Dave Akers, Kevin Costa, and Hector Flores earlier this month. On Monday, February 3rd, 2015, the three newest members of the Terra-Petra Deputy Methane Barrier Inspection Team successfully passed the written and oral portions of the DMB) examinations issued by the Los Angeles Department of Building and Safety (LADBS). Dave Akers, whose history with Terra-Petra dates back to 2005, passed the test for a second time.

The addition of three new DMBIs to the Terra-Petra inspection team is a testament to the company’s exciting expansion and its efforts to continue to grow as an industry leader. As the onslaught of construction projects continues, Terra-Petra continues to stay prepared and flexible to meet clients’ inspection demands. Terra-Petra leads the environmental engineering industry, now, with 10 Deputy Methane Barrier Inspectors on staff. The extension of the design division will ensure that Terra-Petra retains its competitive edge. 

Terra-Petra named methane design engineer and subterranean waterproofing consultant for Korean Air Wilshire Grand project

Wilshire Grand Hotel Los Angeles - AC MARTINTerra-Petra is proud to announce its role as the methane mitigation design engineer and subterranean waterproofing consultant for what will be the tallest building west of the Mississippi, the Korean Air Wilshire Grand project. Once completed, this 73 story skyscraper will top out at 1,100 feet tall and offer 5 levels of subterranean parking below grade. Earlier this year, Terra-Petra contracted with the prestigious architectural design firm of AC Martin Partners to prepare the methane mitigation and waterproofing system construction documents.

Terra-Petra had a very tight window in which to complete our design work, given the discovery of the methane mitigation design requirement only weeks before the foundation only permits were to be pulled. Fortunately, due to the strong capabilities of the Terra-Petra design team, we were able to deliver the necessary drawings on time in order to ennsure the project remained on schedule with no delays.

On November 21, 2013, Terra-Petra attended a pre-construction meeting, with Turner Construction, to discuss the installation of the methane mitigation/waterproofing system for the project (which is scheduled to start in December). Terra-Petra will also be performing the Deputy Methane Barrier Inspection (DMBI) work for the duration of this project.

“It's not every day that you get to say you had a hand in designing the tallest building west of the Mississippi. I am very appreciative of the opportunity that AC Martin has given Terra-Petra to be a part of this prestigious project. You never want to start behind the 8 ball and have to design to an extremely expedited schedule as we had on this project, but we did it! I feel that the work Terra-Petra has carried out is a testament to who we are as a company; knowledgeable, responsive, dedicated and really good at what we do. Needless to say I am very proud of my team," said Justin Conaway, Terra-Petra's Vice President and General Manager. 

According to the Wilshre Grand Center's website: “Starting in 2012, the property at the site of the former Wilshire Grand Hotel will be cleared to make way for a visionary new hotel and mixed-use building. Under the leadership of Korean Air, the developer of the project, the new building will revitalize the property and allow the site to continue being the indelible landmark it has always been. Doors will open to L.A. and the world in 2017, building upon the Wilshire Grand’s rich history." 

Additional highlights: 

  • This innovative project will be a completely new and unique experience in Los Angeles’ downtown. When the doors open in 2017, the project will be one of the most advanced, sophisticated, sustainable and unique buildings in Southern California.
  • With a unique “sky lobby” offering unparalleled views of the city and a breathtaking infinity pool, the building will rise 73 stories in the air as Los Angeles’ second tallest building.
  • 900 state-of-the-art hotel rooms, which will be operated by a flagship luxury hotel brand, will set a new standard for hospitality in Los Angeles.
  • 400,000 square feet of Class ‘A’ office space will attract high-end business leaders and make the building a global engine for business.
  • 45,100 square feet of new restaurant and retail space housing world-class restaurants will make this an epicurean delight and drive downtown’s food and cultural renaissance.
  • Pedestrian friendly access to downtown, as well as local and regional transit connections, will make the project a central and easily accessed location for visitors and Angelenos.
  • Innovative outdoor space and exterior plazas will invite guests and visitors to experience the true Los Angeles lifestyle and climate

For more information go to: www.wilshiregrandcenter.com

Related articles and websites:

http://www.wilshiregrandcenter.com/
http://www.latimes.com/business/la-fi-property-report-20130808,0,976227.story#axzz2lJN2SaRf

Terra-Pertra Congratulates – [AMCOL] CETCO on their new GCL project in Saudi Arabia

HOFFMAN ESTATES, IL – (Marketwired) – AMCOL International Corporation (NYSE: ACO) announced (November 11, 2013) that it is furnishing more than 1.5 million square meters (16 GCL_Installation_400wmillion+ square feet) of its Resistex® geosynthetic clay liner (GCL) product to a new aluminum processing facility in Saudi Arabia.

The $25.3 million contract includes supply of the GCL and all other components of the multi-layer lining system.

The lining materials will be used in the construction of an on-site disposal facility at a new alumina refinery being constructed by Ma’aden Bauxite and Alumina Company, a joint venture between ALCOA Inc. and Saudi Ma’aden Mining Company.

The contract is with Hyundai Engineering and Construction Co., based in Seoul, Korea.

“This project provides an example of the value CETCO provides to our customers via customer-focused research and development. Resistex is part of a family of proprietary GCL products developed through years of research and development, designed to perform in conditions presenting challenges for standard GCLs,” said Patrick Carpenter, President of the AMCOL Construction Technologies segment. “With a global production platform, in-house logistics expertise, and direct access to state of the art technology in minerals performance enhancement, we are uniquely positioned to supply large projects in the mining and minerals processing industries.”

AMCOL and CETCOA wholly owned subsidiary of AMCOL International (NYSE: ACO), Colloid Environmental Technologies Company, LLC (CETCO) is a global construction technologies company with a range of products and services including geosynthetic clay liners (GCLs), drilling products, building materials, engineering support, technical assistance, custom solutions, and research and development.

Terra-Petra Environmental Engineering Heads Up Methane Barrier Inspection for the Port of Los Angeles Port Police Department K-9 Facility

Terra-Petra has announced that it has been contracted to carry out the methan barrier inspection of the methane gas barrier membrane system for the Port of Los Angeles and Port Police Department's new K-9 facility.  Located across the street from the Port, in Wilmington, California, the new state-of-the-art facility will include fourteen indoor dog runs, a grooming room, storage and a climate controlled environment including air conditioning and central heating.

The Port of Los Angeles property lays within the City of Los Angeles' "Methane Zone" and must follow the City of Los Angeles Department of Building Safety's (LADBS) Methane Code within the Port's building requirements

 

1 2 3