Terra-Petra is excited to announce that the methane mitigation system installation is in progress on three new apartment complexes in Playa Vista being developed by The Irvine Company.

The Irvine Company selected the architectural firm of McLarand Vasquez Emsiek & Partners (MVE) out of Irvine to realize their vision of bringing a premier apartment community to the west side of Los Angeles. MVE has designed three mediterranean style apartment complexes each having one level of subterranean parking with on grade parking and four levels of apartments above grade. The building footprints increase in size moving from west to east from 187,067 SQ.FT., 256,866 SQ.FT. and 333,827 SQ.FT. 

MVE’s design team for these three projects included the following prestigious firms:

Structural Engineer: Englekirk –  Los Angeles
Civil Engineer: Fuscoe – Irvine
Geotechnical Engineer: Group Delta – Torrance

The project are located in the City of Los Angeles Methane Zone, thus Terra-Petra was selected by The Irvine Company as the methane design engineer for these projects given our strong Terra-Petra personnel witnessing the installation of Treco Barrier Solutions Vapor Lock-M. Left to right Andrew Alvarran, Jesus Mora, Danile Valdez and Eduardo Rangelreputation as a high quality methane consulting firm as well as our ability to simultaneously design three large scale complex projects in an expedited fashion. We were brought on to the design team in February of this year. We completed the methane mitigation system design work along with all permitted systems by the beginning of October, and way ahead of schedule.

The construction phase of this development began under Western National, serving as the General Contractor on the project. All three buildings are being constructed concurrently and Terra-Petra will be responsible for carrying-out all Deputy Methane Barrier (DMBI) inspection work for each one. The arduous task associated with performing continuous inspections of the methane mitigation system for three projects being constructed simultaneously can only be achieved by Terra-Petra given that we maintain the largest and most experienced staff of DMBI Inspectors in the industry.  

We're looking forward to completing another successful methane mitigation project!

Related articles on the Playa Vista Development.   

http://www.ocbj.com/news/2012/oct/28/irvine-company-eyes-playa-vista/
http://online.wsj.com/news/articles/SB10001424127887324784404578145572308360156
http://articles.latimes.com/2012/nov/26/business/la-fi-mo-playa-vista-sale-20121121