Terra-Petra Completes Methane Barrier and Below Grade Waterproofing Work on Cedars-Sinai’s Completed Advanced Health Sciences Pavilion Project

The new Cedars-Sinai Advanced Health Science Pavilion integrates clinical care and biomedical research in a single building. Terra-Petra Environmental Engineering developed the combination LADBS approved methane mitigation system as well as the buildings below grade waterproofing system for the 820,000 square foot structure.

According to Terra-Petra's VP/General Manager, Justin Conaway, "Terra-Petra performed all LADBS Deputy Methane Barrier Inspections (DMBI) for this project; we also provided manufacturer required below grade waterproofing system inspections to ensure the project received the full 15 year Hydro Shield warranty."

Terra-Petra Deputy Methane Barrier Inspectors are cross-trained, qualified and certified to perform the below grade waterproofing inspections in order to provide a substantial cost-savings by performing both of services with one inspector. Terra-Petra currently employs 7 LADBS Deputy Methane Barrier Inspectors (DMBI).

"We are proud to be a part of such an outstanding project and very excited for Cedars-Sinai Medical Center and their quest to provide services for today's new era of health care within the new Advanced Health Sciences Pavillion," said Kevin Buchanan, President of Terra-Petra.